About

Hello

My name is Sukhbir Singh Bachhal the project is a self powering electric generating system is so unique at the testing a 12 mA from 2.33 V source ran DC motor for 4 minutes and we used 12 V DC @ 3 amp motor ran to rewind the constant torque spring motor that gets fully wound 55 turns in 21 seconds using 0.0008 milliamp/second and now with energy from the constant torque spring powers the generator to produce 18 milliamp/seconds for 195 seconds so we have 18 mA @ 2.40 V DC for extra power for 174 second. I also have put the charge back into the rewinding battery to fully charged in 12 seconds. You see that the spring does not know how quickly it was wound in and how slowly we are releasing the constant torque. In the small scale model ratio took about 15-16 turns per minute from the spring giving the 195 second running time to the generator. Next design will only take 2-3 turns per minute extending running time to 20-30 minutes of generating power, meaning time from 286 hours will be 10 times more. Exact comment of CSA Group report ( If 100 ah was used to power the system, it is reasonable to conclude that it would be able to rewind the spring approximately 5714 times, and have a run time of 286 hours.) See its the control system of power in the invention, it was the balance which the charging, transmitting and cooling have there own circuit from at least three battery packs controlled by the control panel, battery pack A on charging mode, battery pack B on transmitting mode, battery pack C on cooling mode and the system will change modes on all packs when 5% of transmitting battery is used. When separation idea came to me balance happened on its own here is how alternator can produce 20 amps so if I take 1000 watts from transmitting pack I would need 74 amps @ 13.5 volt now for 15 minutes straight I could use that power without building high amp alternator so in 15 minutes I only took 20 amps from the transmitting pack which my 20 amp alternator will charge that battery fully in about 15 minutes and we can continue using 1000 watts from the next pack now you see nothing was on hold except the cooling pack and you can run the system till something happens to it. The next system designing will run for estimated 1200 hours @ 300 watts or more on customers choice. After that minor service will be required twice year.The system will run through any storms that cause power outages that can last for weeks in the cold can be very hard for any age specially senior citizen. The system can be used on regular bases to reduce your power bill and CO2. I am raising funds to design and build market production models. $5000 for design control panel and material $200, spring motor $1500 gear train $1200 machine shop rental, consulting engineer $2000, Patent lawyer $4000, patent fee $4000, batteries $1500, $500 website. These prices includes costumes, taxes, air shipping parts from other countries. This is just designing reason the cost little high. This invention can be used with all electrical and electronic devices, electric vehicle, cruise ships power for there cabins, trains, homes, business, street lights and all can be connected directly and indirectly and all in the claims. Once this is built, it will give me chance to thoroughly make strengthen claims for stronger license agreement. We all know electricity is more in demand and resources are not enough and solar and wind will not have a chance once this hits the market. Dependable ,reliable,renewable Bunty Power. Patent Pending.